Golf Club Development
Latest Progress Report –
Project Overview
Developer: Golf Development LLC
Golf Course Designer: Anderson & Associates Golf Architecture
Project Name: Meadowbrook Golf Club
Course Type: 18-hole championship course with driving range and clubhouse
Total Acreage: 165 acres
Estimated Opening: Fall 2027
Current Construction Status
Phase 1: Site Preparation & Infrastructure (95% Complete)
Completed:
- ✅ Environmental impact assessments and permits approved
- ✅ Tree preservation areas established (40 mature oaks protected)
- ✅ Drainage and irrigation systems installed
- ✅ Access roads and maintenance facilities constructed
- ✅ Utility connections (water, electric, gas) completed
In Progress:
- 🔄 Final grading on holes 12-15 (expected completion: February 2025)
- 🔄 Cart path paving for back nine holes
Phase 2: Course Construction (78% Complete)
Completed Holes: 1-11, 16-18 (14 of 18 holes)
- ✅ Tee boxes shaped and prepared
- ✅ Fairway contouring and rough areas established
- ✅ Green construction with USGA-spec sand base
- ✅ Bunker installation and drainage
Currently Under Construction:
- 🔄 Holes 12-15 shaping and contouring
- 🔄 Practice facility development (driving range, putting green, chipping area)
- 🔄 Water hazard construction on holes 7, 12, and 16
Phase 3: Clubhouse & Facilities (45% Complete)
Foundation & Structure:
- ✅ 12,000 sq ft clubhouse foundation poured
- ✅ Steel frame construction completed
- 🔄 Roofing and exterior work in progress
Planned Amenities:
- Pro shop and equipment rental
- Restaurant with outdoor patio (120 seats)
- Event space for weddings/corporate events
- Locker rooms and cart storage
- Golf instruction academy