Golf Club Development

Latest Progress Report –


Project Overview

Developer: Golf Development LLC
Golf Course Designer: Anderson & Associates Golf Architecture
Project Name: Meadowbrook Golf Club
Course Type: 18-hole championship course with driving range and clubhouse
Total Acreage: 165 acres
Estimated Opening: Fall 2027


Current Construction Status

Phase 1: Site Preparation & Infrastructure (95% Complete)

Completed:

  • ✅ Environmental impact assessments and permits approved
  • ✅ Tree preservation areas established (40 mature oaks protected)
  • ✅ Drainage and irrigation systems installed
  • ✅ Access roads and maintenance facilities constructed
  • ✅ Utility connections (water, electric, gas) completed

In Progress:

  • 🔄 Final grading on holes 12-15 (expected completion: February 2025)
  • 🔄 Cart path paving for back nine holes

Phase 2: Course Construction (78% Complete)

Completed Holes: 1-11, 16-18 (14 of 18 holes)

  • ✅ Tee boxes shaped and prepared
  • ✅ Fairway contouring and rough areas established
  • ✅ Green construction with USGA-spec sand base
  • ✅ Bunker installation and drainage

Currently Under Construction:

  • 🔄 Holes 12-15 shaping and contouring
  • 🔄 Practice facility development (driving range, putting green, chipping area)
  • 🔄 Water hazard construction on holes 7, 12, and 16

Phase 3: Clubhouse & Facilities (45% Complete)

Foundation & Structure:

  • ✅ 12,000 sq ft clubhouse foundation poured
  • ✅ Steel frame construction completed
  • 🔄 Roofing and exterior work in progress

Planned Amenities:

  • Pro shop and equipment rental
  • Restaurant with outdoor patio (120 seats)
  • Event space for weddings/corporate events
  • Locker rooms and cart storage
  • Golf instruction academy